中文版英文版

Central Control Room Intelligence Park System Scheme
| | | Release time: 2022-07-19 11:07:16 | Hits
share:
The Intelligence screen of the central control room is an intelligent and informational exhibition in the park, an early warning display, and a data analysis display to provide real-time dynamic display effect. It also integrates the Triple Video of the park, monitors the abnormal situation of the park in real time and gives an alarm. Provides risk decision support for mixing station production and management.
Secondly, through customized development and configuration, smart screen system can realize the integration of production data, data association, data mining, real-time display of production and consumption on the same day in the park; Production and operation data of Quan Bit Exhibition Mixing Station. For example, the analysis of data on and electricity input in the park and the analysis of energy consumption in the park with production situation in multi-dimensional. As well as monitoring, speed, fuel consumption, track playback and so on.
 
Overall_Case:
The layout of the control room console is divided by office space, and can be divided into production area monitoring, ERP production scheduling, _vehicle scheduling, _production data analysis chart, Park monitoring and other areas. The joint office of mushroom staff in regions can coordinate the production of mushrooms, which can improve the efficiency of production.
The control room takes the central control screen and supporting office tables and chairs as the core, enters into the overall functional plan, takes 55_spliced screen (1213.5mmx684.3mm), screen divides the progress according to the functional area, and draws the corresponding content.
 
★Two Production Line Central Control Room Layout Case
The two production lines are joined by 3*4 splicing case in combination. Reserve 2 for each side of the screen from the wall. The console is designed with two rows and four seats, and the seating distance spliced screen is the best distance for viewing effect. Reserve 2.5_access after the rear seats.
Bit division: 1 operator, 1 Crew dispatcher, 1 quality inspection, 1 ERP dispatcher, 1 production manager and reserved location.
Screen Painting Predefined Contents: Digital Twin System, Slant Belt Monitoring, Intelligent Discharging, Park Monitoring, Ground Point Monitoring, Collapse Monitoring, Other Production Area Monitoring.

 

★Four Production Lines Central Control Room Layout_Case
Four production lines are combined by 3*6 splicing cases. Reserve 2 for each side of the screen from the wall. The console is designed with two rows and six seats, and the seating distance spliced screen is the best distance for viewing effect. Reserve 2.5_access after the rear seats.
Bit division: 2 operators, 1 quality inspector, 1 ERP dispatcher, 1 order administrator, 1 equipment administrator, 1 baud quet Manager
Manager, 1 production manager and reserved location.
Screen Painting Predefined Contents: Digital Twin System, Slant Belt Monitoring, Intelligent Discharging, Park Monitoring, Ground Point Monitoring, Collapse Monitoring, Other Production Area Monitoring.
 

 

 

★Article 6 Layout of control room in production line_Case
Six production lines are joined by 3*8 stitching and filing. Reserve 2 for each side of the screen from the wall. The console is designed with two rows and six seats, and the seating distance spliced screen is the best distance for viewing effect. Reserve 2.5_access after the rear seats.
_Bit division: 4 operators, 1 quality inspector, 1 ERP dispatcher, 1 order manager, 1 equipment administrator, 1 team administrator, 1 production administrator and reserved location.

Screen Painting Predefined Contents: Digital Twin System, Slant Belt Monitoring, Intelligent Discharging, Park Monitoring, Ground Point Monitoring, Collapse Monitoring, Other Production Area Monitoring.